Four detached homes going up on a single landscaped corner in West Cambridge. This page tracks the work as it happens — what is finished, what is underway right now, and what comes next. No renderings standing in for progress. Photographs from the site, updated as each phase closes.

Updated August 2026

A development by

Five phases complete · two underway · nine total
Structure closed in · interiors and site work in progress
01
Complete Summer 2025

Site Preparation

Before anything went up, the corner had to be read carefully. The lot at Concord Avenue and Griswold Street is 9,002 square feet, and the plan committed nearly half of it to open space — so the first decisions were about what stays, not what goes. Two mature canopy trees were identified for preservation and protected in place for the duration of construction. The existing structure came down, the site was cleared and surveyed, and erosion control and tree protection fencing went in before a single machine started digging.

  • Parcel9,002 SF corner lot
  • ApprovalsBuilt as-of-right — no zoning relief required
  • PreservedTwo mature canopy trees protected in place
The corner of Concord Avenue and Griswold Street before construction
Wide shot of the corner before work began. Shoot from across Concord Ave so the whole parcel reads.
Tree protection fencing around preserved canopy trees
Tree protection fencing around the two preserved trees.
Cleared and staked site
Cleared site with survey stakes and erosion control in place.
02
Complete Fall 2025

Excavation & Foundation

Four separate holes, four separate foundations. Because these are detached houses rather than a single building carved into units, each residence sits on its own footprint with its own footings and foundation walls — and the gaps between them, 13 feet 6 inches and 10 feet 6 inches, had to be held precisely from the ground up. Excavation went deep enough to give every home a full finished garden level rather than a utility basement, which is where the fourth bedroom, full bath, family room and laundry eventually land.

  • FoundationsFour independent structures
  • Separation13′-6″ and 10′-6″ between buildings
  • Below grade730–768 SF of finished space per home
Excavation underway at 4 Griswold Street
Excavator working the site — good candidate for a drone frame.
Formwork and rebar for foundation walls
Formwork and rebar before the pour.
Four completed foundations from above
Best drone shot of the project. All four foundations from directly overhead — the only image that proves “detached” at a glance.
Why this phase matters more than it looks. The separation between structures is what makes these single-family homes rather than townhomes. It is set here, in concrete, and it cannot be adjusted later.
03
Complete Winter 2025–26

Framing & Structure

Three stories above grade went up on each of the four foundations, and the shape of the neighborhood-scaled decision became visible for the first time: at 34 feet 6 inches, these homes sit a full ten and a half feet below the 45 feet zoning allows. The floor plates went in at roughly 740 to 780 square feet each on the first and second levels, with a smaller third floor given over entirely to the primary suite — and the roof framing shaped to carry a private terrace off each one.

  • Height34′-6″ against 45′ allowed
  • StoriesThree above grade plus garden level
  • Third floorFull-floor primary suite, each home
  • Above grade1,949–2,042 SF per residence
First floor framing at 4 Griswold Street
First-floor deck and wall framing going up.
All four homes framed to full height
All four framed to full height — strong drone frame from the Concord Ave side.
Roof framing and terrace openings
Roof framing with the terrace openings taking shape.
04
Complete Winter–Spring 2026

Roof & Weather Envelope

Dried in. Pella windows set, the high-reflectance cool roof installed, and the full weather barrier closed up so the interiors could begin. The roof specification here is doing double duty — it is a performance decision as much as a material one, carrying a solar reflectance index of 98 and contributing to a Cambridge Cool Factor score of 3.24 against a passing threshold of 1.0.

  • WindowsPella throughout
  • RoofHigh-SRI cool roof — SRI 98 initial, 87 aged
  • Cool Factor3.24 score · 1.0 required
Pella windows being set
Windows going in.
Cool roof membrane installation
Cool roof installation — drone shot works well here.
All four homes weather-tight
All four weather-tight from the street.
05
Complete Spring 2026

Rough-In, Insulation & Drywall

The systems that make these homes all-electric went in behind the walls: air-source heat pumps for both heating and cooling, energy recovery ventilation bringing filtered fresh air into every room, and electrical serving a building with no gas line to it at all. Cambridge’s fossil-fuel-free declaration applies here, and the homes are built to the Massachusetts Specialized Stretch Code. Once inspections cleared, insulation and drywall closed the walls for good.

  • HeatingAir-source heat pump · 10 HSPF2
  • CoolingAir-source heat pump · 20 SEER2
  • VentilationERV fresh-air system
  • CodeMA Specialized Stretch Code, HERS-rated
Mechanical, electrical and plumbing rough-in
Rough-in before insulation — the shot buyers never get to see.
Heat pump equipment installation
Heat pump and ERV equipment set.
Drywall hung on third floor primary suite
Drywall up — the third-floor primary suite reads best here.
06
Underway now Summer 2026

Interior Finishes

This is where the homes stop being construction and start being houses. Flooring is going down and cabinetry is being set — the kitchens built around Calacatta Claudia stone and panel-ready Thermador appliances, the wet bar that appears in every residence, and the bath program that shifts deliberately as you move through the house: brushed gold in the third-floor primary suite, bronze on the second floor, matte black at the garden level. Large-format matte porcelain, 60-inch alcove soaking tubs, and millwork being fitted room by room.

  • KitchenThermador induction · Calacatta Claudia stone
  • MetalsBrushed gold → bronze → matte black by floor
  • Every homeWet bar, laundry room with undermount sink
  • CurrentlyFlooring and cabinetry installation
Kitchen cabinetry being installed
Lead image for this phase. Cabinetry going in — wide frame, natural light, boxes and packing still visible. Progress reads better than staging here.
Flooring installation in progress
Flooring going down.
Stone countertop template or install
Calacatta Claudia slabs — a close crop of the veining sells this.
Bath tile installation
Large-format porcelain going up in a bath.
07
Underway now Summer 2026

Grading, Utilities & Landscape

Outside, final grading and the last utility work are running in parallel with the interiors. This is the phase that delivers the thing the site plan has been promising since the beginning: 4,449 square feet of open space on a lot where zoning asked for less than two-thirds of that, and roughly a third of the parcel left permeable at grade. Sixteen trees new and transplanted, joining the two that were protected on day one. Techo-bloc patio pavers, reclaimed boulders and river stone, and six-foot horizontal board fencing defining each home’s own garden.

  • Open space4,449 SF — 49.4% against 30% required
  • Permeable32.3% of the lot at grade
  • Planting16 new and transplanted trees
  • ParkingFour off-street spaces, EV-ready · bike parking
Final grading in progress on site
Grading work underway.
Utility trenching and connections
Utility connections going in.
Aerial view of the site during landscape work
Priority drone shot. Overhead frame showing how much of the parcel is landscape rather than building.
Watch this space. Planting is the phase that changes the site fastest. The next set of photographs here will look almost nothing like these.
08
Still to come Fall 2026

Fixtures, Appliances & Final Trim

The last layer. Appliances set and connected — the 36-inch Thermador Professional Induction ProRange, the Masterpiece insert hood, panel-ready refrigeration and dishwashing, the microwave drawer. Plumbing fixtures hung against their floors: the wall-mount pot filler and 32-inch workstation sink in the kitchen, the ceiling-mounted solid brass faucet in the powder room. Paint, final trim, hardware, and the roof terraces finished out.

  • RangeThermador 36″ Professional Induction ProRange
  • Refrigeration36″ Freedom French door, panel-ready
  • SinkRuvati 32″ workstation ledge undermount
  • TerracesPrivate roof terrace finished per home
Appliance installation
Appliances going in. Shoot when the Thermador range is set.
Finished kitchen
First fully finished kitchen — this becomes your hero image everywhere.
Completed roof terrace
Roof terrace at golden hour, looking out over the neighborhood.
09
Still to come Late 2026

Commissioning & Delivery

Every system tested and balanced, the HERS rating issued, final inspections cleared and the certificate of occupancy in hand. Then the part that matters: keys. Four homes, four sets, four households on one corner in West Cambridge.

  • VerificationIndependent HERS rating & blower door testing
  • CommissioningHeat pump and ERV systems balanced
  • FinalCertificate of occupancy & walkthrough
The completed Griswold Collective
The finished project. Until this exists, a rendering can hold the slot — label it as one.

Get the build updates

A short note each time a phase closes — new photographs, what changed on site, and what is coming next. Sent only when there is something to show.

Request updates 4 Griswold Street · Cambridge, MA 02138 · 617 963 6128